Finished Front Porch
Digging with the BobCat
Alteration to Existing Frame
Framing
Rough saw Interior Panels
Front porch add on
Ceiling Install
Finish Carpentry
Heat Pump & Air Purifier
Interior Door
Closet
Closet Doors
Ceiling
Windows with a view
Interior Walls
Mother Mary
Floor

Ready to Add on to this Cabin
Get digging with Tye's Backhoe 1969 Case 580 Construction King
Digging for Foundation
Digging for Foundation
Excavated Dirt used for future Picnic Area !
Footings
Concrete Shoot
Ready to pour footings
Footings done
Footings done
Stem walls going up
Stem walls
Stem wall rebar
Stem wall rebar
Stem walls
Pouring the 4' stem walls
Stem wall Complete
Stem wall Complete
Tye Back filling with the 1999 Cub Cadet 26HP Tractor
Back filling Gravel
Opening to Existing Cabin
Sub-floor Framing
Sub-floor Framing
Framing Thoughts
Walls going up
Photo opt. Tye Barnett Framing
Richard Moore & Tye Barnett Framing Ceiling Joist
Framing
Ready for roof & Siding
Johnny Putting down the Metal roof
Tye Barnett Siding the Back Wall
Siding
Johnny sanding The Beams for stain
Richard Sanding Trim for Stain
Staining Cabinet Doors
Trim
Richard , Tye & Johnny [ THE CREW]









Finished Front Porch
Handrail
Ceiling